BT carried out planned work that affected one of our 4 links to them at 1AM and 2AM. This caused lines to drop and reconnect. BT failed to inform us of this work (again). Had BT informed us then we would have cleanly moved traffic of the affected link.
A formal complaint has been raised with BT. (Drops between 3AM and 5AM were A&A planned work)