Relating to https://aastatus.net/2358 we are undergoing currently in an emergency at-risk period as we perform some tests along side TalkTalk staff. We don't expect any problems, but this work involves re-routing TalkTalk traffic within our network. This work is happening now. Sorry for the no notice.
We have successfully and cleanly moved all TalkTalk traffic off our THN interconnect and on to our HEX Interconnect. (Usually we use both all the time, but for this testing we are forcing traffic through the HEX side)
We're bringing back routing across both links now...
We are now moving traffic to our THN interconnect.
We're now back to using both the TalkTalk links. Tests completed.